It has been very busy times on the water for vessels using our Xeamos products, with three sea trials taking place on three seas (the North Sea, Mediterranean Sea and Indian Ocean) within the space of just one month.
In total, the three projects have a total installed power of 30.000 kw, with the total reduced NOx during the 4 hours of endurance testing for all three vessels topping out at an impressive 600kg.
Well done team Xeamos!